Here's a list of projects that I need to complete this spring before the racing starts:
- Finish epoxy work on inside of cabin and paint inside repairs of cabin
- Repair a small dimple on the front of my mast
- Take the steps to make Maybe drownproof
- Repair the side storage cabinets
- Polish the sides
- Burnish the Baltoplate bottom
- Get the boat remeasured for the areas possibly affected by the repairs (i.e. weight)
- Put together the rest of my crew for the season
These projects are also on my list but can afford to be done a latter time:
- Painting topside of deck with a non-slip finish
- Paint mast
- Replace halyards
No comments:
Post a Comment